ITAC Assessment: TA0093
ITAC logo
ITAC Assessment: TA0093
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Forged Metal Parts
NAICS 332111: Iron and Steel Forging
SIC 3462: Iron and Steel Forgings
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 60,000
ft2
Annual Production 800,000
lb
Production Hrs. Annual 4,288
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,316 925,175
kWh
Electricity Demand $22,464 4,324
kW-mo/yr
Natural Gas $108,775 15,628
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,250 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $15,635 $390 $13,380
156,744
kWh
$2,255
-
kW-mo/yr
02 2.4239: Eliminate or reduce compressed air usage $12,125 $10 $10,375
121,556
kWh
$1,750
-
kW-mo/yr
03 2.6218: Turn off equipment when not in use $2,560 - $1,640
19,193
kWh
$920
-
kW-mo/yr
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,110 - $950
11,149
kWh
$160
-
kW-mo/yr
05 2.7142: Utilize higher efficiency lamps and/or ballasts $820 $1,430 $700
8,233
kWh
$120
-
kW-mo/yr
TOTAL RECOMMENDED $32,250 $1,830 $27,045
316,875
kWh
$5,205
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs