ITAC Assessment: TA0086
ITAC logo
ITAC Assessment: TA0086
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Thermo Electric Modules
NAICS 333911: Pump and Pumping Equipment Manufacturing
SIC 3561: Pumps and Pumping Equipment
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 88,150
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 2,976
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $234,927 3,919,374
kWh
Electricity Demand $41,202 8,676
kW-mo/yr
Electricity Fees $10,828 -
Natural Gas $6,828 802
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,167 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.4226: Use / purchase optimum sized compressor $5,742 - $5,742
93,100
kWh
- -
02 2.4322: Use or replace with energy efficient substitutes $4,520 $5,800 $4,030
65,350
kWh
$490
-
kW-mo/yr
-
03 2.2437: Recover waste heat from equipment $3,950 $5,000 - - $3,950
04 2.7221: Lower temperature during the winter season and vice-versa $2,350 - $2,350
38,100
kWh
- -
05 2.7224: Reduce space conditioning during non-working hours $2,605 $2,000 $2,605
42,204
kWh
- -
TOTAL RECOMMENDED $19,167 $12,800 $14,727
238,754
kWh
$490
-
kW-mo/yr
$3,950
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs