Assessment Year | 2004 |
---|---|
Principal Product | Petroleum Lubricating Oil |
NAICS | 324191: Petroleum Lubricating Oil and Grease Manufacturing |
SIC | 2952: Asphalt Felts and Coatings |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
89,000
ft2
|
Annual Production | 7,200,000
lb
|
Production Hrs. Annual | 2,560
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $15,974 | 211,440 |
kWh
|
$0.076 |
Electricity Demand | $14,230 | 1,949 |
kW-mo/yr
|
$7.30 |
Electricity Fees | $155 | - |
|
- |
Natural Gas | $33,863 | 4,381 |
MMBtu
|
$7.73 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $21,564 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2162: Reduce excess steam bleeding | $6,613 | - | - | - |
$6,613
-
MMBtu
|
- | |
02 | 2.8114: Change rate schedules or other changes in utility service | $4,480 | - | - | - | - | $4,480 | |
03 | 2.2136: Install / repair insulation on steam lines | $3,760 | $1,150 | - | - |
$3,760
-
MMBtu
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,090 | $500 |
$1,375
19,624
kWh
|
$715
-
kW-mo/yr
|
- | - | |
05 | 2.2122: Install / repair insulation on condensate lines | $1,360 | $1,610 | - | - |
$1,360
-
MMBtu
|
- | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $416 | $10 |
$416
5,950
kWh
|
- | - | - | |
07 | 2.7124: Make a practice of turning off lights when not needed | $2,235 | - |
$2,235
31,920
kWh
|
- | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $610 | $230 |
$400
5,760
kWh
|
$210
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $21,564 | $3,500 |
$4,426
63,254
kWh
|
$925
-
kW-mo/yr
|
$11,733
-
MMBtu
|
$4,480 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs