| Assessment Year | 2004 |
|---|---|
| Principal Product | Bakery Equipment |
| NAICS | 333241: Food Product Machinery Manufacturing |
| SIC | 3556: Food Products Machinery |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
97,000
ft2
|
| Annual Production | 4
pieces
|
| Production Hrs. Annual | 2,580
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $121,476 | 1,980,450 |
kWh
|
$0.061 |
| Electricity Demand | $45,093 | 5,916 |
kW-mo/yr
|
$7.62 |
| Electricity Fees | $2,219 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $24,175 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $18,295 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.8114: Change rate schedules or other changes in utility service | $14,730 | - |
$14,730
-
kWh
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,395 | $960 |
$1,115
23,660
kWh
|
$1,280
-
kW-mo/yr
|
|
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,170 | $10 |
$1,170
24,885
kWh
|
- | |
| 04 | 2.7229: Air condition only space necessary | $1,090 | - |
$600
12,660
kWh
|
$490
-
kW-mo/yr
|
|
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,970 | - |
$920
19,453
kWh
|
$1,050
-
kW-mo/yr
|
|
| 06 | 2.7423: Reduce heat gain by window tinting | $2,820 | $7,720 |
$2,820
59,765
kWh
|
- | |
| TOTAL RECOMMENDED | $24,175 | $8,690 |
$21,355
140,423
kWh
|
$2,820
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $18,295 | $970 |
$17,015
48,545
kWh
|
$1,280
-
kW-mo/yr
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs