ITAC Assessment: TA0072
ITAC logo
ITAC Assessment: TA0072
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Institutional Furniture Manufacturing
NAICS 337127: Institutional Furniture Manufacturing
SIC 2541: Wood Office and Store Fixtures, Partitions, Shelving, and Lockers
Sales Range $10
M
to 50
M
# of Employees 225
Plant Area 486,000
ft2
Annual Production 500
pieces
Production Hrs. Annual 4,328
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $129,497 2,398,960
kWh
Electricity Demand $30,007 6,885
kW-mo/yr
Electricity Fees $456 -
Natural Gas $25,106 3,945
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,720 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,945

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7231: Use radiant heater for spot heating $25,095 $4,666 $8,685
143,930
kWh
$1,710
-
kW-mo/yr
$14,700
-
MMBtu
-
02 2.8114: Change rate schedules or other changes in utility service $13,600 - - - - $13,600
03 2.7229: Air condition only space necessary $7,680 $150 - - $7,680
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,360 $190 $2,020
33,500
kWh
$340
-
kW-mo/yr
- -
05 2.4238: Do not use compressed air for personal cooling $775 - $390
6,514
kWh
$385
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $210 $320 $192
3,189
kWh
$18
-
kW-mo/yr
- -
TOTAL RECOMMENDED $49,720 $5,326 $11,287
187,133
kWh
$2,453
-
kW-mo/yr
$22,380
-
MMBtu
$13,600
TOTAL IMPLEMENTED $16,945 $510 $2,602
43,203
kWh
$743
-
kW-mo/yr
- $13,600
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs