ITAC Assessment: GT0534
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Firearms Training Simulators
NAICS
n/a
SIC 3699: Electrical Machinery, Equipment, and Supplies, Not Elsewhere
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 86,000
ft2
Annual Production 300
pieces
Production Hrs. Annual 2,500
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,570 992,087
kWh
Natural Gas $6,970 1,137
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,870 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,090 $2,770 n/a $2,090
21,981
kWh
02 2.7221: Lower temperature during the winter season and vice-versa $2,040 - n/a $2,040
52,755
kWh
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $9,970 $3,700 n/a $9,970
-
kWh
04 2.4133: Use most efficient type of electric motors $580 $5,280 n/a $580
5,862
kWh
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $190 $260 n/a $190
2,052
kWh
TOTAL RECOMMENDED $14,870 $12,010 $14,870
82,650
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs