ITAC Assessment: TA0066
ITAC logo
ITAC Assessment: TA0066
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Fabrics and Cushions
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 50,000
ft2
Annual Production 4,000
thousand feet
Production Hrs. Annual 2,150
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,755 698,946
kWh
Electricity Demand $11,520 3,600
kW-mo/yr
Electricity Fees $2,270 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,345 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,734

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $29,101 $28,080 - - - $29,101
02 4.811: Demolish old building to reduce tax and insurance bills $2,218 - - $2,218 - -
03 2.7221: Lower temperature during the winter season and vice-versa $1,854 - $1,854
34,340
kWh
- - -
04 2.7447: Install vinyl strip / high speed / air curtain doors $1,240 $3,740 $1,240
22,560
kWh
- - -
05 2.2135: Repair and eliminate steam leaks $893 - $893
16,539
kWh
- - -
06 3.5314: Use in-process recycling whenever possible $630 $210 - - $630
-
lb
-
07 2.7221: Lower temperature during the winter season and vice-versa $668 - $668
12,374
kWh
- - -
08 2.7111: Reduce illumination to minimum necessary levels $557 - $557
10,320
kWh
- - -
09 3.5314: Use in-process recycling whenever possible $184 $270 - - $184
-
lb
-
TOTAL RECOMMENDED $37,345 $32,300 $5,212
96,133
kWh
$2,218 $814
-
lb
$29,101
TOTAL IMPLEMENTED $34,734 $28,080 $3,415
63,253
kWh
$2,218 - $29,101
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs