| Assessment Year | 2003 |
|---|---|
| Principal Product | Fabrics and Cushions |
| NAICS | 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing |
| SIC | 3724: Aircraft Engines and Engine Parts |
| Sales Range | $10 M to 50M |
| # of Employees | 120 |
| Plant Area |
50,000
ft2
|
| Annual Production | 4,000
thousand feet
|
| Production Hrs. Annual | 2,150
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $37,755 | 698,946 |
kWh
|
$0.054 |
| Electricity Demand | $11,520 | 3,600 |
kW-mo/yr
|
$3.20 |
| Electricity Fees | $2,270 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $37,345 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $34,734 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $29,101 | $28,080 | - | - | - | $29,101 | |
| 02 | 4.811: Demolish old building to reduce tax and insurance bills | $2,218 | - | - | $2,218 | - | - | |
| 03 | 2.7221: Lower temperature during the winter season and vice-versa | $1,854 | - |
$1,854
34,340
kWh
|
- | - | - | |
| 04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,240 | $3,740 |
$1,240
22,560
kWh
|
- | - | - | |
| 05 | 2.2135: Repair and eliminate steam leaks | $893 | - |
$893
16,539
kWh
|
- | - | - | |
| 06 | 3.5314: Use in-process recycling whenever possible | $630 | $210 | - | - |
$630
-
lb
|
- | |
| 07 | 2.7221: Lower temperature during the winter season and vice-versa | $668 | - |
$668
12,374
kWh
|
- | - | - | |
| 08 | 2.7111: Reduce illumination to minimum necessary levels | $557 | - |
$557
10,320
kWh
|
- | - | - | |
| 09 | 3.5314: Use in-process recycling whenever possible | $184 | $270 | - | - |
$184
-
lb
|
- | |
| TOTAL RECOMMENDED | $37,345 | $32,300 |
$5,212
96,133
kWh
|
$2,218 |
$814
-
lb
|
$29,101 | ||
| TOTAL IMPLEMENTED | $34,734 | $28,080 |
$3,415
63,253
kWh
|
$2,218 | - | $29,101 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs