ITAC Assessment: TA0065
ITAC logo
ITAC Assessment: TA0065
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Plastics Hoses
NAICS 326121: Unlaminated Plastics Profile Shape Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 56,000
ft2
Annual Production 10,100
thousand feet
Production Hrs. Annual 4,160
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $118,968 2,323,600
kWh
Electricity Demand $54,694 7,270
kW-mo/yr
Electricity Fees $310 -
Natural Gas $23,385 2,955
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $244,513 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $157,733

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.5194: Redesign process $75,086 - $56
1,552
kWh
$47
-
kW-mo/yr
- $74,983 -
02 4.611: Begin a practice of predictive / preventative maintenance $64,800 $5,200 - - - - $64,800
03 3.2136: Use "wash-less" processing equipment $49,000 $1,768 $565
15,517
kWh
$510
-
kW-mo/yr
- $47,925 -
04 3.1191: Change procedures / equipment / operating conditions $37,440 $1,027 - - - $37,440 -
05 2.8114: Change rate schedules or other changes in utility service $11,900 - - - - - $11,900
06 4.652: Replace existing equipment with more suitable substitutes $2,426 $6,000 $2,426
66,664
kWh
- - - -
07 2.8121: Apply for tax-free status for energy purchases $1,793 - - - - - $1,793
08 2.1211: Move boiler to more efficient location $1,422 $1,894 $738
20,273
kWh
$684
-
kW-mo/yr
- - -
09 2.7121: Utilize daylight whenever possible in lieu of artificial light $306 $140 $306
8,414
kWh
- - - -
10 2.7124: Make a practice of turning off lights when not needed $194 - $101
2,771
kWh
$93
-
kW-mo/yr
- - -
11 2.2136: Install / repair insulation on steam lines $146 $142 - - $146
-
MMBtu
- -
TOTAL RECOMMENDED $244,513 $16,171 $4,192
115,191
kWh
$1,334
-
kW-mo/yr
$146
-
MMBtu
$160,348 $78,493
TOTAL IMPLEMENTED $157,733 $13,234 $3,526
96,903
kWh
$731
-
kW-mo/yr
- $74,983 $78,493
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs