ITAC Assessment: TA0059
ITAC logo
ITAC Assessment: TA0059
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Semiconductors&Related Devices
NAICS 334413: Semiconductor and Related Device Manufacturing
SIC 3674: Semiconductors and Related Devices
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 44,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 4,406
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $153,908 3,063,780
kWh
Electricity Demand $49,065 6,439
kW-mo/yr
Electricity Fees $3,423 -
Natural Gas $5,350 852
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,401 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,775

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $9,950 - $9,950
196,900
kWh
- -
02 2.7491: Insulate glazing, walls, ceilings, and roofs $5,536 $500 $5,536
109,520
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,885 $7,671 $3,525
69,780
kWh
$1,360
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,890 $200 $2,090
41,290
kWh
$800
-
kW-mo/yr
-
05 2.1131: Repair faulty insulation in furnaces, boilers, etc $2,100 $585 - - $2,100
-
MMBtu
06 2.1132: Repair faulty louvers and dampers $2,040 $625 $2,040
40,290
kWh
- -
TOTAL RECOMMENDED $27,401 $9,581 $23,141
457,780
kWh
$2,160
-
kW-mo/yr
$2,100
-
MMBtu
TOTAL IMPLEMENTED $7,775 $7,871 $5,615
111,070
kWh
$2,160
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs