Assessment Year | 2003 |
---|---|
Principal Product | Semiconductors&Related Devices |
NAICS | 334413: Semiconductor and Related Device Manufacturing |
SIC | 3674: Semiconductors and Related Devices |
Sales Range | $10 M to 50M |
# of Employees | 180 |
Plant Area |
44,000
ft2
|
Annual Production | 1,000,000
pieces
|
Production Hrs. Annual | 4,406
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $153,908 | 3,063,780 |
kWh
|
$0.050 |
Electricity Demand | $49,065 | 6,439 |
kW-mo/yr
|
$7.62 |
Electricity Fees | $3,423 | - |
|
- |
Natural Gas | $5,350 | 852 |
MMBtu
|
$6.28 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $27,401 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,775 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $9,950 | - |
$9,950
196,900
kWh
|
- | - | |
02 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $5,536 | $500 |
$5,536
109,520
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,885 | $7,671 |
$3,525
69,780
kWh
|
$1,360
-
kW-mo/yr
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,890 | $200 |
$2,090
41,290
kWh
|
$800
-
kW-mo/yr
|
- | |
05 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $2,100 | $585 | - | - |
$2,100
-
MMBtu
|
|
06 | 2.1132: Repair faulty louvers and dampers | $2,040 | $625 |
$2,040
40,290
kWh
|
- | - | |
TOTAL RECOMMENDED | $27,401 | $9,581 |
$23,141
457,780
kWh
|
$2,160
-
kW-mo/yr
|
$2,100
-
MMBtu
|
||
TOTAL IMPLEMENTED | $7,775 | $7,871 |
$5,615
111,070
kWh
|
$2,160
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs