ITAC Assessment: TA0054
ITAC logo
ITAC Assessment: TA0054
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Metal Electrical Enclosures and Boxes
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 130,000
ft2
Annual Production 300,000
pieces
Production Hrs. Annual 4,544
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,871 1,203,917
kWh
Electricity Demand $37,085 4,958
kW-mo/yr
Electricity Fees $340 -
Natural Gas $46,433 8,301
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,005,354 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,447

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 4.721: Initiate a program to acquire iso certification $1,000,000 $25,150 - - - $1,000,000
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,893 - $1,378
27,264
kWh
$515
-
kW-mo/yr
- -
03 2.2211: Use optimum temperature $1,215 - - - $1,215
-
MMBtu
-
04 2.7111: Reduce illumination to minimum necessary levels $907 $54 $657
13,000
kWh
$250
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $757 $1,550 $442
8,744
kWh
$315
-
kW-mo/yr
- -
06 2.4314: Use synthetic lubricant $316 - $223
4,412
kWh
$93
-
kW-mo/yr
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $266 $444 $223
4,415
kWh
$43
-
kW-mo/yr
- -
TOTAL RECOMMENDED $1,005,354 $27,198 $2,923
57,835
kWh
$1,216
-
kW-mo/yr
$1,215
-
MMBtu
$1,000,000
TOTAL IMPLEMENTED $4,447 $1,994 $2,266
44,835
kWh
$966
-
kW-mo/yr
$1,215
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs