| Assessment Year | 2003 |
|---|---|
| Principal Product | Metal Electrical Enclosures and Boxes |
| NAICS | 332322: Sheet Metal Work Manufacturing |
| SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
130,000
ft2
|
| Annual Production | 300,000
pieces
|
| Production Hrs. Annual | 4,544
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $60,871 | 1,203,917 |
kWh
|
$0.051 |
| Electricity Demand | $37,085 | 4,958 |
kW-mo/yr
|
$7.48 |
| Electricity Fees | $340 | - |
|
- |
| Natural Gas | $46,433 | 8,301 |
MMBtu
|
$5.59 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $1,005,354 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $4,447 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 4.721: Initiate a program to acquire iso certification | $1,000,000 | $25,150 | - | - | - | $1,000,000 | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,893 | - |
$1,378
27,264
kWh
|
$515
-
kW-mo/yr
|
- | - | |
| 03 | 2.2211: Use optimum temperature | $1,215 | - | - | - |
$1,215
-
MMBtu
|
- | |
| 04 | 2.7111: Reduce illumination to minimum necessary levels | $907 | $54 |
$657
13,000
kWh
|
$250
-
kW-mo/yr
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $757 | $1,550 |
$442
8,744
kWh
|
$315
-
kW-mo/yr
|
- | - | |
| 06 | 2.4314: Use synthetic lubricant | $316 | - |
$223
4,412
kWh
|
$93
-
kW-mo/yr
|
- | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $266 | $444 |
$223
4,415
kWh
|
$43
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $1,005,354 | $27,198 |
$2,923
57,835
kWh
|
$1,216
-
kW-mo/yr
|
$1,215
-
MMBtu
|
$1,000,000 | ||
| TOTAL IMPLEMENTED | $4,447 | $1,994 |
$2,266
44,835
kWh
|
$966
-
kW-mo/yr
|
$1,215
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs