ITAC Assessment: TA0051
ITAC logo
ITAC Assessment: TA0051
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Investment Casting
NAICS 331512: Steel Investment Foundries
SIC 3324: Steel Investment Foundries
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 200,000
ft2
Annual Production 5,500
pieces
Production Hrs. Annual 8,556
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $270,562 6,131,327
kWh
Electricity Demand $98,813 16,774
kW-mo/yr
Electricity Fees $7,293 -
Natural Gas $218,729 45,123
MMBtu
LPG $20,998 3,054
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,533,338 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $74,682

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
01 3.1191: Change procedures / equipment / operating conditions $1,410,425 $467,000 $8,820
212,163
kWh
$1,605
-
kW-mo/yr
- - $1,400,000
02 2.2425: Use flue gases to heat process or service water $53,166 $17,450 - - $53,166
-
MMBtu
- -
03 4.112: Replace old machine with new automatic multi-station tool $48,231 $30,800 - - - - $48,231
04 3.4115: Recover and reuse cooling water $19,775 $51,000 - - - $19,775
-
Tgal
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,741 - $1,741
41,890
kWh
- - - -
TOTAL RECOMMENDED $1,533,338 $566,250 $10,561
254,053
kWh
$1,605
-
kW-mo/yr
$53,166
-
MMBtu
$19,775
-
Tgal
$1,448,231
TOTAL IMPLEMENTED $74,682 $68,450 $1,741
41,890
kWh
- $53,166
-
MMBtu
$19,775
-
Tgal
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs