Assessment Year | 2003 |
---|---|
Principal Product | Corrugated Boxes |
NAICS | 336390: Other Motor Vehicle Parts Manufacturing |
SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
150,000
ft2
|
Annual Production | 700,000
thousand feet
|
Production Hrs. Annual | 6,216
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $192,058 | 4,652,256 |
kWh
|
$0.041 |
Electricity Demand | $56,767 | 9,906 |
kW-mo/yr
|
$5.73 |
Electricity Fees | $7,526 | - |
|
- |
Natural Gas | $166,317 | 43,355 |
MMBtu
|
$3.84 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $39,048 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $36,763 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $12,000 | $24,409 |
$12,000
311,733
kWh
|
- | - | - | - | |
02 | 4.444: Install system to collect scrap | $6,700 | $82 | - | - | - | - | $6,700 | |
03 | 2.2135: Repair and eliminate steam leaks | $6,390 | $1,045 | - | - | - |
$6,390
-
MMBtu
|
- | |
04 | 2.7229: Air condition only space necessary | $6,360 | - | - | - | - |
$6,360
-
MMBtu
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,340 | $130 |
$2,690
70,480
kWh
|
$650
-
kW-mo/yr
|
- | - | - | |
06 | 2.8121: Apply for tax-free status for energy purchases | $1,083 | - | - | - | $1,083 | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $750 | - |
$600
16,110
kWh
|
$150
-
kW-mo/yr
|
- | - | - | |
08 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $745 | - |
$545
14,255
kWh
|
$200
-
kW-mo/yr
|
- | - | - | |
09 | 2.2136: Install / repair insulation on steam lines | $690 | $170 | - | - | - |
$690
-
MMBtu
|
- | |
10 | 2.7122: Disconnect ballasts | $530 | $47 |
$430
11,230
kWh
|
$100
-
kW-mo/yr
|
- | - | - | |
11 | 2.7135: Install occupancy sensors | $260 | $250 |
$260
6,730
kWh
|
- | - | - | - | |
12 | 2.2122: Install / repair insulation on condensate lines | $200 | $129 | - | - | - |
$200
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $39,048 | $26,262 |
$16,525
430,538
kWh
|
$1,100
-
kW-mo/yr
|
$1,083 |
$13,640
-
MMBtu
|
$6,700 | ||
TOTAL IMPLEMENTED | $36,763 | $25,965 |
$14,690
382,213
kWh
|
$650
-
kW-mo/yr
|
$1,083 |
$13,640
-
MMBtu
|
$6,700 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs