ITAC Assessment: TA0031
ITAC logo
ITAC Assessment: TA0031
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Corrugated Boxes
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 239,000
ft2
Annual Production 4,000,000,000
thousand feet
Production Hrs. Annual 6,264
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $157,712 4,401,256
kWh
Electricity Demand $68,448 8,388
kW-mo/yr
Electricity Fees $24,252 -
Natural Gas $230,836 50,994
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,915 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,415

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7229: Air condition only space necessary $16,500 $31,000 - - $16,500
-
MMBtu
02 2.2135: Repair and eliminate steam leaks $11,090 $480 - - $11,090
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,000 $840 $5,000
162,634
kWh
- -
04 2.2136: Install / repair insulation on steam lines $4,520 $1,200 - - $4,520
-
MMBtu
05 2.7135: Install occupancy sensors $390 $180 $390
12,650
kWh
- -
06 2.7124: Make a practice of turning off lights when not needed $315 - $180
5,763
kWh
$135
-
kW-mo/yr
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $100 $200 $60
1,962
kWh
$40
-
kW-mo/yr
-
TOTAL RECOMMENDED $37,915 $33,900 $5,630
183,009
kWh
$175
-
kW-mo/yr
$32,110
-
MMBtu
TOTAL IMPLEMENTED $21,415 $2,900 $5,630
183,009
kWh
$175
-
kW-mo/yr
$15,610
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs