Assessment Year | 2002 |
---|---|
Principal Product | Lamp Bases and Leads |
NAICS |
n/a
|
SIC | 3641: Electric Lamp Bulbs and Tubes |
Sales Range | $10 M to 50M |
# of Employees | 93 |
Plant Area |
110,000
ft2
|
Annual Production | 12,000,000,000
pieces
|
Production Hrs. Annual | 6,296
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $216,977 | 5,028,480 |
kWh
|
$0.043 |
Electricity Demand | $66,858 | 8,971 |
kW-mo/yr
|
$7.45 |
Electricity Fees | $25,471 | - |
|
- |
Natural Gas | $44,486 | 59,778 |
MMBtu
|
$0.74 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $9,889 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,659 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,400 | $1,120 |
$4,400
124,000
kWh
|
- | - | |
02 | 2.7494: Install storm windows and doors | $1,690 | $230 | - | - |
$1,690
-
MMBtu
|
|
03 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,230 | - |
$1,230
34,342
kWh
|
- | - | |
04 | 2.2511: Insulate bare equipment | $980 | $400 | - | - |
$980
-
MMBtu
|
|
05 | 2.7135: Install occupancy sensors | $875 | $346 |
$875
24,425
kWh
|
- | - | |
06 | 2.3132: Recharge batteries on during off-peak demand periods | $500 | - | - |
$500
-
kW-mo/yr
|
- | |
07 | 2.7292: Lower ceiling to reduce conditioned space | $214 | - | - | - |
$214
-
MMBtu
|
|
TOTAL RECOMMENDED | $9,889 | $2,096 |
$6,505
182,767
kWh
|
$500
-
kW-mo/yr
|
$2,884
-
MMBtu
|
||
TOTAL IMPLEMENTED | $8,659 | $2,096 |
$5,275
148,425
kWh
|
$500
-
kW-mo/yr
|
$2,884
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs