ITAC Assessment: TA0020
ITAC logo
ITAC Assessment: TA0020
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Photo Masks
NAICS
n/a
SIC 3861: Photographic Equipment and Supplies
Sales Range $50
M
to 100
M
# of Employees 203
Plant Area 14,500
ft2
Annual Production 22,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $435,956 11,919,240
kWh
Electricity Demand $163,114 19,832
kW-mo/yr
Electricity Fees $32,286 -
Natural Gas $69,126 10,494
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,350 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,175

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $16,175 $26,460 n/a $11,000
304,638
kWh
$5,175
-
kW-mo/yr
- -
02 4.821: Pay bills on time to avoid late fees $4,751 - - - $4,751 -
03 2.7132: Install timers on light switches in little used areas $3,260 $240 $3,260
90,385
kWh
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,415 $1,715 $1,415
39,238
kWh
- - -
05 2.2511: Insulate bare equipment $1,110 $321 - - - $1,110
-
MMBtu
06 2.2511: Insulate bare equipment $685 $140 - - - $685
-
MMBtu
07 2.7135: Install occupancy sensors $584 $320 $584
16,188
kWh
- - -
08 2.2511: Insulate bare equipment $370 $160 - - - $370
-
MMBtu
TOTAL RECOMMENDED $28,350 $29,356 $16,259
450,449
kWh
$5,175
-
kW-mo/yr
$4,751 $2,165
-
MMBtu
TOTAL IMPLEMENTED $12,175 $2,896 $5,259
145,811
kWh
- $4,751 $2,165
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs