ITAC Assessment: TA0019
ITAC logo
ITAC Assessment: TA0019
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Automotive Heating and A/C Systems
NAICS
n/a
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 90,000
ft2
Annual Production 0
pieces
Production Hrs. Annual 4,353
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $161,630 2,963,215
kWh
Electricity Demand $44,498 9,262
kW-mo/yr
Electricity Fees $10,979 -
Natural Gas $37,629 4,735
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,668 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,035

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
01 4.441: Install automatic packing equipment $27,478 $2,805 - - - - $27,478
02 2.8114: Change rate schedules or other changes in utility service $11,836 $225 - $11,836 - - -
03 2.7496: Install partitions to reduce size of conditioned space $5,994 $3,000 $5,994
82,650
kWh
- - - -
04 3.3131: Use evaporation to concentrate material $5,184 $5,331 - - - $5,184
-
Tgal
-
05 2.7135: Install occupancy sensors $1,015 $346 $1,015
13,995
kWh
- - - -
06 2.2136: Install / repair insulation on steam lines $161 $140 - - $161
-
MMBtu
- -
TOTAL RECOMMENDED $51,668 $11,847 $7,009
96,645
kWh
$11,836 $161
-
MMBtu
$5,184
-
Tgal
$27,478
TOTAL IMPLEMENTED $18,035 $5,902 $1,015
13,995
kWh
$11,836 - $5,184
-
Tgal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs