ITAC Assessment: SU0537
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Polyurethane adhesive and sealants
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2891: Adhesives and Sealants
Sales Range $50
M
to 100
M
# of Employees 120
Plant Area 185,000
ft2
Annual Production 25,000
units
Production Hrs. Annual 3,900
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $195,367 3,907,320
kWh
Electricity Demand $71,948 11,912
kW-mo/yr
Electricity Fees $13,829 -
Natural Gas $329,699 34,364
MMBtu
TOTAL YEARLY COSTS $610,843
RECOMMENDED SAVINGS* $75,070 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $10,479 - - $10,479
-
kW-mo/yr
- -
02 2.7122: Disconnect ballasts $140 - $94
2,084
kWh
$46
-
kW-mo/yr
- -
03 2.7224: Reduce space conditioning during non-working hours $939 - - - $939
-
MMBtu
-
04 2.4239: Eliminate or reduce compressed air usage $7,744 - $7,744
172,093
kWh
- - -
05 2.2437: Recover waste heat from equipment $38,869 $390 - - $38,869
-
MMBtu
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,763 $500 $7,763
172,520
kWh
- - -
07 2.2136: Install / repair insulation on steam lines $1,091 $140 - - $1,091
-
MMBtu
-
08 2.4239: Eliminate or reduce compressed air usage $3,448 $742 $3,448
76,620
kWh
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,268 $521 $631
14,016
kWh
$116
-
kW-mo/yr
- $521
10 2.7142: Utilize higher efficiency lamps and/or ballasts $683 $526 $201
4,460
kWh
$116
-
kW-mo/yr
- $367
11 2.7314: Reduce ventilation air $2,120 $2,030 $536
15,717
kWh
- $1,584
-
MMBtu
-
12 2.6211: Conserve energy by efficient use of vending machines $420 $974 $420
9,330
kWh
- - -
13 2.7135: Install occupancy sensors $104 $514 $104
2,321
kWh
- - -
TOTAL RECOMMENDED $75,070 $6,336 $20,942
469,161
kWh
$10,757
-
kW-mo/yr
$42,483
-
MMBtu
$888
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs