| Assessment Year | 2002 | 
|---|---|
| Principal Product | Industrial enzymes | 
| NAICS | n/a | 
| SIC | 2836: Biological Products, Except Diagnostic Substances | 
| Sales Range | $50 Mto 100 M | 
| # of Employees | 92 | 
| Plant Area | 140,000 
ft2
 | 
| Annual Production | 25,794 
ton
 | 
| Production Hrs. Annual | 8,760 
hrs
 | 
| Location (State) | Iowa | 
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,507,014 | 51,888,000 | 
kWh
 | $0.029 | 
| Electricity Demand | $964,614 | 94,764 | 
kW-mo/yr
 | $10.18 | 
| Other Energy | $60,793 | 215,880 | 
MMBtu
 | $0.28 | 
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $159,827 | See individual recommendations below*Non-energy impacts included in savings. | ||
| IMPLEMENTED SAVINGS* | $143,247 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | 
|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,657 | $200 | $2,489 86,741
                                 
kWh
 | $1,168 -
                                 
kW-mo/yr
 | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $143,247 | $20 | $97,498 3,397,128
                                 
kWh
 | $45,749 -
                                 
kW-mo/yr
 | |
| 03 | 2.7135: Install occupancy sensors | $416 | $532 | $416 14,485
                                 
kWh
 | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,119 | $5,981 | $928 32,328
                                 
kWh
 | $1,191 -
                                 
kW-mo/yr
 | |
| 05 | 2.7135: Install occupancy sensors | $10,388 | $30,450 | $10,388 361,959
                                 
kWh
 | - | |
| TOTAL RECOMMENDED | $159,827 | $37,183 | $111,719 3,892,641
                                 
kWh
 | $48,108 -
                                 
kW-mo/yr
 | ||
| TOTAL IMPLEMENTED | $143,247 | $20 | $97,498 3,397,128
                                 
kWh
 | $45,749 -
                                 
kW-mo/yr
 | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs
             
             
             
            