ITAC Assessment: IA0295
ITAC logo
ITAC Assessment: IA0295
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Industrial enzymes
NAICS
n/a
SIC 2836: Biological Products, Except Diagnostic Substances
Sales Range $50
M
to 100
M
# of Employees 92
Plant Area 140,000
ft2
Annual Production 25,794
ton
Production Hrs. Annual 8,760
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,507,014 51,888,000
kWh
Electricity Demand $964,614 94,764
kW-mo/yr
Other Energy $60,793 215,880
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $159,827 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $143,247

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,657 $200 $2,489
86,741
kWh
$1,168
-
kW-mo/yr
02 2.4231: Reduce the pressure of compressed air to the minimum required $143,247 $20 $97,498
3,397,128
kWh
$45,749
-
kW-mo/yr
03 2.7135: Install occupancy sensors $416 $532 $416
14,485
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,119 $5,981 $928
32,328
kWh
$1,191
-
kW-mo/yr
05 2.7135: Install occupancy sensors $10,388 $30,450 $10,388
361,959
kWh
-
TOTAL RECOMMENDED $159,827 $37,183 $111,719
3,892,641
kWh
$48,108
-
kW-mo/yr
TOTAL IMPLEMENTED $143,247 $20 $97,498
3,397,128
kWh
$45,749
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs