ITAC Assessment: SU0536
ITAC logo
ITAC Assessment: SU0536
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Non Ferrous Metals and Alloys
NAICS 331410: Nonferrous Metal (except Aluminum) Smelting and Refining
SIC 3369: Nonferrous Foundries, Except Aluminum and Copper
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 75,000
ft2
Annual Production 4,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $44,522 1,089,600
kWh
Electricity Demand $201,208 7,320
kW-mo/yr
Electricity Fees $11,488 -
Natural Gas $33,806 6,566
MMBtu
Waste Disposal Costs
Water Usage $1,325 571
Tgal
Solid Waste (non-haz) $22,000 220
lb
TOTAL YEARLY COSTS $314,349
RECOMMENDED SAVINGS* $16,897 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4239: Eliminate or reduce compressed air usage $1,020 - $1,020
24,866
kWh
- - -
02 2.8121: Apply for tax-free status for energy purchases $4,848 $50 - - - $4,848
03 2.8121: Apply for tax-free status for energy purchases $2,400 $50 - - - $2,400
04 2.7142: Utilize higher efficiency lamps and/or ballasts $398 $194 $198
4,818
kWh
$181
-
kW-mo/yr
- $19
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $176 $80 $176
4,296
kWh
- - -
06 2.7314: Reduce ventilation air $713 $499 $428
10,367
kWh
- $284
-
MMBtu
-
07 2.1321: Replace fossil fuel equipment with electrical equipment $7,221 $21,000 $7,221
61,250
kWh
- - -
08 2.7135: Install occupancy sensors $122 $468 $122
2,967
kWh
- - -
TOTAL RECOMMENDED $16,897 $22,341 $9,164
108,563
kWh
$181
-
kW-mo/yr
$284
-
MMBtu
$7,268
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs