ITAC Assessment: SU0528
ITAC logo
ITAC Assessment: SU0528
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Printing & Manufacturing of Corporate Identity, Marketing Collateral, Repositionable Adhesive Products, Screen Print, Embroidery, Direct Mail
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 190
Plant Area 180,000
ft2
Annual Production 1,000,000
lb
Production Hrs. Annual 5,616
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $108,300 1,777,052
kWh
Electricity Demand $126,896 11,060
kW-mo/yr
Electricity Fees $(-1,323.9) -
Natural Gas $25,329 8,714
MMBtu
TOTAL YEARLY COSTS $259,200
RECOMMENDED SAVINGS* $30,370 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.7122: Disconnect ballasts $276 - $198
3,235
kWh
$78
-
kW-mo/yr
- -
02 2.4239: Eliminate or reduce compressed air usage $5,262 - $5,262
86,398
kWh
- - -
03 2.4322: Use or replace with energy efficient substitutes $4,193 $100 $3,106
51,000
kWh
$1,721
-
kW-mo/yr
$(-632.9)
-
MMBtu
-
04 2.2437: Recover waste heat from equipment $6,434 $414 - - $6,434
-
MMBtu
-
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $6,343 $660 - $6,343
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $5,717 $2,594 $3,993
65,572
kWh
$1,607
-
kW-mo/yr
- $117
07 2.7142: Utilize higher efficiency lamps and/or ballasts $189 $115 $112
1,839
kWh
$29
-
kW-mo/yr
- $49
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,305 $875 $1,305
21,429
kWh
- - -
09 2.7135: Install occupancy sensors $650 $1,804 $650
10,670
kWh
- - -
TOTAL RECOMMENDED $30,370 $6,562 $14,626
240,143
kWh
$9,778
-
kW-mo/yr
$5,801
-
MMBtu
$166
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs