ITAC Assessment: SU0527
ITAC logo
ITAC Assessment: SU0527
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Mass Transit bus and commute bus manufacturing
NAICS 336120: Heavy Duty Truck Manufacturing
SIC 3711: Motor Vehicles and Passenger Car Bodies
Sales Range $100
M
to 500
M
# of Employees 394
Plant Area 161,250
ft2
Annual Production 535
units
Production Hrs. Annual 4,125
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,820 1,337,222
kWh
Electricity Demand $39,468 4,578
kW-mo/yr
Electricity Fees $2,135 -
Natural Gas $90,374 25,106
MMBtu
TOTAL YEARLY COSTS $188,797
RECOMMENDED SAVINGS* $101,388 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.7122: Disconnect ballasts $14,621 - $9,289
221,158
kWh
$5,332
-
kW-mo/yr
- -
02 2.4239: Eliminate or reduce compressed air usage $2,026 - $2,026
48,429
kWh
- - -
03 2.8121: Apply for tax-free status for energy purchases $4,522 $26 - - - $4,522
04 2.8121: Apply for tax-free status for energy purchases $1,708 $26 - - - $1,708
05 2.4322: Use or replace with energy efficient substitutes $877 $32 $669
15,938
kWh
$453
-
kW-mo/yr
$(-244.7)
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $484 $224 $320
7,621
kWh
$90
-
kW-mo/yr
- $74
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,990 $1,787 $3,990
95,000
kWh
- - -
08 2.2511: Insulate bare equipment $18,264 $9,030 $(-732.1)
(-17,430)
kWh
$(-1,086.1)
-
kW-mo/yr
$20,082
-
MMBtu
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $14,474 $24,111 $8,128
193,513
kWh
$4,666
-
kW-mo/yr
- $1,680
10 2.9114: Use solar heat to make electricty $40,423 $248,940 $40,423
856,250
kWh
- - -
TOTAL RECOMMENDED $101,388 $284,176 $64,113
1,420,478
kWh
$9,454
-
kW-mo/yr
$19,837
-
MMBtu
$7,984
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs