ITAC Assessment: AM0500
ITAC logo
ITAC Assessment: AM0500
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Post tension products
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 220,000
ft2
Annual Production 17,000,000
pieces
Production Hrs. Annual 8,520
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $158,240 2,286,144
kWh
Electricity Demand $22,511 6,143
kW-mo/yr
Electricity Fees $3,130 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $410,515 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,473

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 4.441: Install automatic packing equipment $183,000 $50,000 - - - $183,000 -
02 4.441: Install automatic packing equipment $142,000 $225,000 - - - $142,000 -
03 4.441: Install automatic packing equipment $40,600 $50,000 - - - $40,600 -
04 4.441: Install automatic packing equipment $30,500 $272 - - - $30,500 -
05 2.3212: Optimize plant power factor $6,900 $6,900 - $6,900
-
kW-mo/yr
- - -
06 2.7121: Utilize daylight whenever possible in lieu of artificial light $4,520 - $4,520
64,000
kWh
- - - -
07 2.6218: Turn off equipment when not in use $1,800 - $1,800
25,300
kWh
- - - -
08 3.5212: Regrind, reuse, or sell scrap plastic parts $430 - - - $430
-
lb
- -
09 2.4314: Use synthetic lubricant $422 - $381
5,400
kWh
$41
-
kW-mo/yr
- - -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $343 $192 $87
1,230
kWh
$11
-
kW-mo/yr
- $39 $206
TOTAL RECOMMENDED $410,515 $332,364 $6,788
95,930
kWh
$6,952
-
kW-mo/yr
$430
-
lb
$396,139 $206
TOTAL IMPLEMENTED $9,473 $7,092 $1,887
26,530
kWh
$6,911
-
kW-mo/yr
$430
-
lb
$39 $206
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs