ITAC Assessment: SU0519
ITAC logo
ITAC Assessment: SU0519
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Ceramics
NAICS 336992: Military Armored Vehicle, Tank, and Tank Component Manufacturing
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 13
Plant Area 79,000
ft2
Annual Production 5
units
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $50,749 1,342,013
kWh
Electricity Demand $67,147 8,477
kW-mo/yr
Electricity Fees $13,028 -
Natural Gas $10,397 1,414
MMBtu
TOTAL YEARLY COSTS $141,322
RECOMMENDED SAVINGS* $16,712 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $3,052 - - - - $3,052
02 2.8121: Apply for tax-free status for energy purchases $967 - - - - $967
03 2.4322: Use or replace with energy efficient substitutes $384 $25 $291
7,650
kWh
$333
-
kW-mo/yr
$(-239.8)
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,384 $285 $117
3,066
kWh
$33
-
kW-mo/yr
- $4,234
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,650 $294 $2,650
69,731
kWh
- - -
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,357 $675 - $3,357
-
kW-mo/yr
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,214 $498 $841
22,125
kWh
$335
-
kW-mo/yr
- $38
08 2.4239: Eliminate or reduce compressed air usage $244 $479 $244
6,417
kWh
- - -
09 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $312 $1,100 $312
8,214
kWh
- - -
10 2.7135: Install occupancy sensors $149 $746 $149
3,929
kWh
- - -
TOTAL RECOMMENDED $16,712 $4,102 $4,603
121,131
kWh
$4,058
-
kW-mo/yr
$(-239.8)
-
MMBtu
$8,291
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs