Assessment Year | 2002 |
---|---|
Principal Product | Trusses |
NAICS |
n/a
|
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
105,720
ft2
|
Annual Production | 20,350
thousand feet
|
Production Hrs. Annual | 6,100
hrs
|
Location (State) | Nevada |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $82,975 | 1,294,068 |
kWh
|
$0.064 |
Electricity Demand | $5,744 | 2,834 |
kW-mo/yr
|
$2.03 |
Electricity Fees | $16,078 | - |
|
- |
Natural Gas | $3,654 | 391 |
MMBtu
|
$9.35 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $58,829 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $35,855 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $23,605 | $180 |
$19,957
275,720
kWh
|
$3,648
-
kW-mo/yr
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,017 | $11 |
$775
10,715
kWh
|
$242
-
kW-mo/yr
|
- | |
03 | 2.7135: Install occupancy sensors | $543 | $1,875 |
$385
5,318
kWh
|
$158
-
kW-mo/yr
|
- | |
04 | 2.4133: Use most efficient type of electric motors | $209 | $164 |
$177
2,449
kWh
|
$32
-
kW-mo/yr
|
- | |
05 | 2.7232: Replace existing hvac unit with high efficiency model | $3,723 | $16,500 |
$2,841
39,268
kWh
|
$882
-
kW-mo/yr
|
- | |
06 | 2.6218: Turn off equipment when not in use | $3,736 | $4,622 |
$3,736
51,616
kWh
|
- | - | |
07 | 2.6218: Turn off equipment when not in use | $3,565 | $60 |
$3,565
49,249
kWh
|
- | - | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $11,034 | $5,800 |
$9,624
132,973
kWh
|
$1,410
-
kW-mo/yr
|
- | |
09 | 3.6124: Burn waste oil for heat | $5,757 | $9,000 |
$536
7,411
kWh
|
$497
-
kW-mo/yr
|
$4,724 | |
10 | 3.5242: Recover metals from spent solutions and recycle | $5,640 | $60 | - | - | $5,640 | |
TOTAL RECOMMENDED | $58,829 | $38,272 |
$41,596
574,719
kWh
|
$6,869
-
kW-mo/yr
|
$10,364 | ||
TOTAL IMPLEMENTED | $35,855 | $21,537 |
$31,051
429,017
kWh
|
$4,804
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs