Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Power transmission shafts
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 220
Plant Area 133,000
ft2
Annual Production 1,000
units
Production Hrs. Annual 2,610
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $596,392 6,552,347
kWh
Electricity Fees $1,508 -
Natural Gas $29,783 6,097
MMBtu
Waste Disposal Costs
Water Usage $12,500 430,000
Tgal
TOTAL YEARLY COSTS $640,183
RECOMMENDED SAVINGS* $8,885 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,156

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,730 - $1,730
19,218
kWh
-
02 2.8121: Apply for tax-free status for energy purchases $673 $100 - $673
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,987 $2,215 $4,448
48,867
kWh
$1,539
04 2.7142: Utilize higher efficiency lamps and/or ballasts $496 $365 $474
5,265
kWh
$22
TOTAL RECOMMENDED $8,885 $2,680 $6,651
73,350
kWh
$2,234
TOTAL IMPLEMENTED $7,156 $2,680 $4,922
54,132
kWh
$2,234
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs