Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Abrasive Powders
NAICS 327910: Abrasive Product Manufacturing
SIC 3291: Abrasive Products
Sales Range $10
M
to 50
M
# of Employees 29
Plant Area 257,921
ft2
Annual Production 800,000
lb
Production Hrs. Annual 2,210
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $18,059 844,749
kWh
Electricity Demand $22,950 3,000
kW-mo/yr
Electricity Fees $40,802 -
Natural Gas $87,460 21,284
MMBtu
TOTAL YEARLY COSTS $169,271
RECOMMENDED SAVINGS* $7,426 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,660

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.7122: Disconnect ballasts $59 - $20
972
kWh
$39
-
kW-mo/yr
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $194 - $194
9,209
kWh
- - -
03 2.7442: Keep doors and windows shut when not on use $1,333 $79 - - $1,333
-
MMBtu
-
04 3.1161: Eliminate/reduce an operation $2,215 $2,374 $(-23.0)
(-1,100)
kWh
$(-518.0)
-
kW-mo/yr
- $2,756
05 2.4231: Reduce the pressure of compressed air to the minimum required $358 $393 $358
17,069
kWh
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $75 $108 $16
760
kWh
$32
-
kW-mo/yr
- $27
07 2.7241: Install outside air damper / economizer on hvac unit $3,193 $7,120 - - $3,193
-
MMBtu
-
TOTAL RECOMMENDED $7,426 $10,074 $565
26,910
kWh
$(-447.9)
-
kW-mo/yr
$4,526
-
MMBtu
$2,783
TOTAL IMPLEMENTED $1,660 $187 $230
10,941
kWh
$70
-
kW-mo/yr
$1,333
-
MMBtu
$27
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs