| Assessment Year | 2021 |
|---|---|
| Principal Product | Abrasive Powders |
| NAICS | 327910: Abrasive Product Manufacturing |
| SIC | 3291: Abrasive Products |
| Sales Range | $10 M to 50M |
| # of Employees | 29 |
| Plant Area |
257,921
ft2
|
| Annual Production | 800,000
lb
|
| Production Hrs. Annual | 2,210
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $18,059 | 844,749 |
kWh
|
$0.021 |
| Electricity Demand | $22,950 | 3,000 |
kW-mo/yr
|
$7.65 |
| Electricity Fees | $40,802 | - |
|
- |
| Natural Gas | $87,460 | 21,284 |
MMBtu
|
$4.11 |
| TOTAL YEARLY COSTS | $169,271 | |||
| RECOMMENDED SAVINGS* | $7,426 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $1,660 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7122: Disconnect ballasts | $59 | - |
$20
972
kWh
|
$39
-
kW-mo/yr
|
- | - | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $194 | - |
$194
9,209
kWh
|
- | - | - | |
| 03 | 2.7442: Keep doors and windows shut when not on use | $1,333 | $79 | - | - |
$1,333
-
MMBtu
|
- | |
| 04 | 3.1161: Eliminate/reduce an operation | $2,215 | $2,374 |
$(-23.0)
(-1,100)
kWh
|
$(-518.0)
-
kW-mo/yr
|
- | $2,756 | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $358 | $393 |
$358
17,069
kWh
|
- | - | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $75 | $108 |
$16
760
kWh
|
$32
-
kW-mo/yr
|
- | $27 | |
| 07 | 2.7241: Install outside air damper / economizer on hvac unit | $3,193 | $7,120 | - | - |
$3,193
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $7,426 | $10,074 |
$565
26,910
kWh
|
$(-447.9)
-
kW-mo/yr
|
$4,526
-
MMBtu
|
$2,783 | ||
| TOTAL IMPLEMENTED | $1,660 | $187 |
$230
10,941
kWh
|
$70
-
kW-mo/yr
|
$1,333
-
MMBtu
|
$27 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs