Assessment Year | 2020 |
---|---|
Principal Product | Boron Nitride |
NAICS | 327910: Abrasive Product Manufacturing |
SIC | 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 46 |
Plant Area |
94,000
ft2
|
Annual Production | 322,000
lb
|
Production Hrs. Annual | 8,424
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $297,240 | 37,349,972 |
kWh
|
$0.008 | |
Electricity Demand | $606,131 | 102,039 |
kW-mo/yr
|
$5.94 | |
Electricity Fees | $79,841 | - |
|
- | |
Natural Gas | $108,700 | 23,943 |
MMBtu
|
$4.54 | |
Other Gas | $3,613 | 89 |
MMBtu
|
$40.60 | |
Waste Disposal Costs | |||||
Water Usage | $54,477 | 18,000,000 |
Tgal
|
$0.003 | |
TOTAL YEARLY COSTS | $1,150,002 | ||||
RECOMMENDED SAVINGS* | $8,884 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $6,339 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,000 | - |
$1,000
124,998
kWh
|
- | - | - | |
02 | 2.4322: Use or replace with energy efficient substitutes | $327 | $32 |
$414
51,744
kWh
|
$915
-
kW-mo/yr
|
$(-1,001.9)
-
MMBtu
|
- | |
03 | 2.2136: Install / repair insulation on steam lines | $1,235 | $257 | - | - |
$1,235
-
MMBtu
|
- | |
04 | 2.7224: Reduce space conditioning during non-working hours | $177 | $5,032 | - | - |
$177
-
MMBtu
|
- | |
05 | 2.7314: Reduce ventilation air | $1,191 | $882 |
$112
14,073
kWh
|
- |
$1,079
-
MMBtu
|
- | |
06 | 3.1161: Eliminate/reduce an operation | $1,415 | $1,857 |
$(-8.7)
1,083
kWh
|
$(-370.7)
-
kW-mo/yr
|
- | $1,794 | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $302 | $510 |
$39
4,818
kWh
|
$39
-
kW-mo/yr
|
- | $224 | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,107 | $51,554 |
$666
83,217
kWh
|
$1,176
-
kW-mo/yr
|
- | $1,265 | |
09 | 2.7135: Install occupancy sensors | $131 | $4,097 |
$131
16,326
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $8,884 | $64,222 |
$2,353
296,259
kWh
|
$1,759
-
kW-mo/yr
|
$1,489
-
MMBtu
|
$3,283 | ||
TOTAL IMPLEMENTED | $6,339 | $58,268 |
$1,231
153,852
kWh
|
$2,130
-
kW-mo/yr
|
$1,489
-
MMBtu
|
$1,489 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs