ITAC Assessment: SU0487
ITAC logo
ITAC Assessment: SU0487
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product medical Instrumentation
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $100
M
to 500
M
# of Employees 500
Plant Area 239,425
ft2
Annual Production 2,700,000
units
Production Hrs. Annual 8,760
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $533,018 10,422,032
kWh
Electricity Demand $205,857 14,356
kW-mo/yr
Electricity Fees $10,425 -
Natural Gas $134,558 32,788
MMBtu
Waste Disposal Costs
Solid Waste (haz) $300,000 1
lb
TOTAL YEARLY COSTS $1,183,858
RECOMMENDED SAVINGS* $31,775 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,781

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 4.821: Pay bills on time to avoid late fees $1,476 - - - - - $1,476
02 2.7224: Reduce space conditioning during non-working hours $185 - - - $185
-
MMBtu
- -
03 2.8121: Apply for tax-free status for energy purchases $3,639 $240 - - - - $3,639
04 2.4322: Use or replace with energy efficient substitutes $2,098 $165 $673
13,200
kWh
$1,656
-
kW-mo/yr
$(-231.0)
-
MMBtu
- -
05 3.1161: Eliminate/reduce an operation $12,498 $9,690 $(-265.0)
(-5,200)
kWh
$(-2,237.0)
-
kW-mo/yr
- $6,000 $9,000
06 2.7142: Utilize higher efficiency lamps and/or ballasts $992 $1,073 $375
7,359
kWh
$145
-
kW-mo/yr
- $306 $166
07 2.7314: Reduce ventilation air $4,618 $5,591 $1,474
28,904
kWh
- $3,144
-
MMBtu
- -
08 2.7135: Install occupancy sensors $2,607 $3,425 $2,607
51,127
kWh
- - - -
09 2.6211: Conserve energy by efficient use of vending machines $287 $602 $287
5,634
kWh
- - - -
10 2.2414: Use waste heat from hot flue gases to preheat $3,375 $15,784 - - $3,375
-
MMBtu
- -
TOTAL RECOMMENDED $31,775 $36,570 $5,151
101,024
kWh
$(-436.0)
-
kW-mo/yr
$6,473
-
MMBtu
$6,306 $14,281
TOTAL IMPLEMENTED $14,781 $9,855 $408
8,000
kWh
$(-581.0)
-
kW-mo/yr
$(-46.0)
-
MMBtu
$6,000 $9,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs