Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Radiators
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 353,403
ft2
Annual Production 17,336,652
units
Production Hrs. Annual 4,160
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $462,988 8,659,916
kWh
Electricity Demand $100,711 28,587
kW-mo/yr
Electricity Fees $13,209 -
Natural Gas $198,793 50,435
MMBtu
Waste Disposal Costs
Water Usage $64,400 15,470
Tgal
Other Liquid (non-haz) $2,800 1
gal
Solid Waste (non-haz) $20,700 1
lb
TOTAL YEARLY COSTS $863,601
RECOMMENDED SAVINGS* $41,734 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,213

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7224: Reduce space conditioning during non-working hours $359 - - - $359
-
MMBtu
- -
02 2.4322: Use or replace with energy efficient substitutes $1,163 $99 $1,102
20,790
kWh
$407
-
kW-mo/yr
$(-346.0)
-
MMBtu
- -
03 2.7314: Reduce ventilation air $4,494 $890 $1,431
26,998
kWh
- $3,063
-
MMBtu
- -
04 3.1161: Eliminate/reduce an operation $6,082 $2,288 $(-209.5)
(-3,952)
kWh
$(-274.8)
-
kW-mo/yr
- - $6,566
05 2.7142: Utilize higher efficiency lamps and/or ballasts $26,788 $21,904 $19,672
371,178
kWh
$3,798
-
kW-mo/yr
- - $3,318
06 2.7491: Insulate glazing, walls, ceilings, and roofs $869 $845 - - $869
-
MMBtu
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $802 $857 $404
7,621
kWh
$37
-
kW-mo/yr
- $191 $171
08 2.6211: Conserve energy by efficient use of vending machines $411 $839 $411
7,747
kWh
- - - -
09 2.7135: Install occupancy sensors $767 $2,060 $767
14,475
kWh
- - - -
TOTAL RECOMMENDED $41,734 $29,782 $23,577
444,857
kWh
$3,967
-
kW-mo/yr
$3,945
-
MMBtu
$191 $10,055
TOTAL IMPLEMENTED $1,213 $1,696 $815
15,368
kWh
$37
-
kW-mo/yr
- $191 $171
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings