ITAC Assessment: MS0032
ITAC logo
ITAC Assessment: MS0032
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Furniture
NAICS
n/a
SIC 2512: Wood Household Furniture, Upholstered
Sales Range $50
M
to 100
M
# of Employees 400
Plant Area 290,000
ft2
Annual Production 130,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $184,703 2,775,498
kWh
Natural Gas $19,566 2,832
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,826 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,556

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7124: Make a practice of turning off lights when not needed $973 $75 $973
32,239
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,838 $11,514 $6,838
101,114
kWh
-
03 2.7227: Use water on air conditioning exchanger to improve heat transfer and increase air conditioner efficiency $2,758 $5,700 $2,758
37,808
kWh
-
04 2.3212: Optimize plant power factor $674 $1,800 $674
-
kWh
-
05 2.6214: Shut off pilots in standby equipment $1,583 $20 - $1,583
-
MMBtu
TOTAL RECOMMENDED $12,826 $19,109 $11,243
171,161
kWh
$1,583
-
MMBtu
TOTAL IMPLEMENTED $2,556 $95 $973
32,239
kWh
$1,583
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs