ITAC Assessment: MS0380
ITAC logo
ITAC Assessment: MS0380
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Door Skins
NAICS 321911: Wood Window and Door Manufacturing
SIC 2431: Millwork
Sales Range $10
M
to 50
M
# of Employees 450
Plant Area 1,800,000
ft2
Annual Production 15,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $6,002,058 101,982,120
kWh
Electricity Demand $1,281,733 195,965
kW-mo/yr
Electricity Fees $91,188 -
Natural Gas $1,768,802 340,604
MMBtu
Wood $661,320 1,189,425
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $275,468 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Wood Savings
01 2.2135: Repair and eliminate steam leaks $19,820 $561 - - - - $19,820
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $123,143 $194,049 $101,998
1,412,851
kWh
$19,325
-
kW-mo/yr
$1,820 - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $81,959 $85,986 $68,514
952,062
kWh
$12,231
-
kW-mo/yr
$1,214 - -
04 2.1122: Re-size charging openings or add a movable door on equipment $8,239 $4,272 - - - $8,239
-
MMBtu
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $30,363 $7,080 $20,462
283,431
kWh
$9,452
-
kW-mo/yr
$449 - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,944 $466 $11,770
161,996
kWh
- $174 - -
TOTAL RECOMMENDED $275,468 $292,414 $202,744
2,810,340
kWh
$41,008
-
kW-mo/yr
$3,657 $8,239
-
MMBtu
$19,820
-
MMBtu
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Wood Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs