ITAC Assessment: SU0450
ITAC logo
ITAC Assessment: SU0450
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Metal Finishing
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $10
M
to 50
M
# of Employees 219
Plant Area 89,000
ft2
Annual Production 42,500
units
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $166,416 4,190,059
kWh
Electricity Demand $91,047 8,854
kW-mo/yr
Electricity Fees $10,092 -
Natural Gas $239,664 64,969
MMBtu
TOTAL YEARLY COSTS $507,219
RECOMMENDED SAVINGS* $27,706 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,063

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 3.1161: Eliminate/reduce an operation $7,150 $4,350 $(-162.0)
(-4,050)
kWh
$(-925.6)
-
kW-mo/yr
- $2,363 $5,875
02 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $2,004 $1,340 $2,004
50,103
kWh
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,719 $4,657 $2,975
74,378
kWh
$1,520
-
kW-mo/yr
- $875 $349
04 2.7142: Utilize higher efficiency lamps and/or ballasts $402 $508 $172
4,293
kWh
$61
-
kW-mo/yr
- $116 $54
05 2.7314: Reduce ventilation air $340 $512 $81
2,028
kWh
- $259
-
MMBtu
- -
06 2.2414: Use waste heat from hot flue gases to preheat $11,933 $22,600 - - $11,933
-
MMBtu
- -
07 2.6211: Conserve energy by efficient use of vending machines $158 $374 $158
3,941
kWh
- - - -
TOTAL RECOMMENDED $27,706 $34,341 $5,228
130,693
kWh
$655
-
kW-mo/yr
$12,193
-
MMBtu
$3,353 $6,278
TOTAL IMPLEMENTED $8,063 $6,509 $5,060
126,509
kWh
$1,520
-
kW-mo/yr
$259
-
MMBtu
$875 $349
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs