ITAC Assessment: SU0448
ITAC logo
ITAC Assessment: SU0448
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Polystyrene Foam Products
NAICS 326140: Polystyrene Foam Product Manufacturing
SIC 3086: Plastics Foam Products
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 103,580
ft2
Annual Production 10,669,344
lb
Production Hrs. Annual 8,760
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $460,675 10,510,975
kWh
Electricity Demand $351,977 44,644
kW-mo/yr
Electricity Fees $21,527 -
Natural Gas $16,507 2,033
MMBtu
Fuel Oil #1 $5,911 568
MMBtu
Waste Disposal Costs
Water Usage $768 124
Tgal
TOTAL YEARLY COSTS $857,365
RECOMMENDED SAVINGS* $55,057 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $55,057

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $18,874 - - - - - $18,874
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,132 - $4,186
95,127
kWh
$946
-
kW-mo/yr
- - -
03 4.821: Pay bills on time to avoid late fees $613 - - - - - $613
04 2.8121: Apply for tax-free status for energy purchases $579 - - - - - $579
05 2.2437: Recover waste heat from equipment $4,442 $1,512 - - $4,442
-
MMBtu
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $9,066 $3,806 $5,380
122,288
kWh
$1,608
-
kW-mo/yr
- $770 $1,308
07 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $3,044 $1,820 $3,044
69,184
kWh
- - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,147 $975 $507
11,521
kWh
$249
-
kW-mo/yr
- $14 $377
09 2.7142: Utilize higher efficiency lamps and/or ballasts $256 $260 $108
2,460
kWh
$27
-
kW-mo/yr
- $4 $117
10 2.7314: Reduce ventilation air $680 $913 $153
3,479
kWh
- $527
-
MMBtu
- -
11 2.2614: Use cooling tower or economizer to replace chiller cooling $11,224 $37,300 $9,018
204,958
kWh
$2,206
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $55,057 $46,586 $22,396
509,017
kWh
$5,036
-
kW-mo/yr
$4,969
-
MMBtu
$788 $21,868
TOTAL IMPLEMENTED $55,057 $46,586 $22,396
509,017
kWh
$5,036
-
kW-mo/yr
$4,969
-
MMBtu
$788 $21,868
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs