ITAC Assessment: SU0442
ITAC logo
ITAC Assessment: SU0442
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Optics Manufacturing
NAICS 333314: Optical Instrument and Lens Manufacturing
SIC 3827: Optical Instruments and Lenses
Sales Range $10
M
to 50
M
# of Employees 275
Plant Area 55,000
ft2
Annual Production 50,000
pieces
Production Hrs. Annual 6,682
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $192,522 4,045,859
kWh
Electricity Demand $88,904 7,363
kW-mo/yr
Electricity Fees $9,217 -
Natural Gas $23,672 3,986
MMBtu
Waste Disposal Costs
Water Usage $8,000 2,750
Tgal
TOTAL YEARLY COSTS $322,315
RECOMMENDED SAVINGS* $25,683 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,801

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $6,103 - $6,603
137,553
kWh
- - $(-450.0) $(-50.0)
02 2.8121: Apply for tax-free status for energy purchases $1,092 - - - - - $1,092
03 3.1161: Eliminate/reduce an operation $10,476 $4,400 $(-72.0)
(-1,500)
kWh
$(-290.0)
-
kW-mo/yr
- $4,500 $6,338
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,098 $946 $658
13,698
kWh
$297
-
kW-mo/yr
- $1,080 $63
05 2.7142: Utilize higher efficiency lamps and/or ballasts $948 $563 $147
3,066
kWh
$51
-
kW-mo/yr
- $623 $127
06 2.7314: Reduce ventilation air $1,697 $1,147 $272
5,677
kWh
- $1,425
-
MMBtu
- -
07 2.4322: Use or replace with energy efficient substitutes $3,087 $7,500 $1,348
28,080
kWh
$1,739
-
kW-mo/yr
- - -
08 2.6211: Conserve energy by efficient use of vending machines $74 $208 $74
1,533
kWh
- - - -
09 2.4321: Upgrade obsolete equipment $108 $356 $80
1,665
kWh
$28
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $25,683 $15,120 $9,110
189,772
kWh
$1,825
-
kW-mo/yr
$1,425
-
MMBtu
$5,753 $7,570
TOTAL IMPLEMENTED $18,801 $5,527 $6,832
142,317
kWh
$(-211.0)
-
kW-mo/yr
- $4,673 $7,507
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs