ITAC Assessment: SU0426
ITAC logo
ITAC Assessment: SU0426
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Milk Ingredients
NAICS 311514: Dry, Condensed, and Evaporated Dairy Product Manufacturing
SIC 2032: Canned Specialties
Sales Range $100
M
to 500
M
# of Employees 65
Plant Area 110,000
ft2
Annual Production 765,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $713,637 17,539,495
kWh
Electricity Demand $326,282 56,147
kW-mo/yr
Electricity Fees $4,994 -
Natural Gas $781,444 242,783
MMBtu
Waste Disposal Costs
Water Usage $222,683 71,567
Tgal
Water Disposal $291,617 101,609
Tgal
TOTAL YEARLY COSTS $2,340,657
RECOMMENDED SAVINGS* $132,496 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,359

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7135: Install occupancy sensors $6,669 $7,515 $6,669
162,651
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $1,123 $1,486 $1,123
27,410
kWh
-
03 2.2437: Recover waste heat from equipment $114,014 $187,500 - $114,014
-
MMBtu
04 2.2414: Use waste heat from hot flue gases to preheat $10,690 $110,000 - $10,690
-
MMBtu
TOTAL RECOMMENDED $132,496 $306,501 $7,792
190,061
kWh
$124,704
-
MMBtu
TOTAL IMPLEMENTED $17,359 $117,515 $6,669
162,651
kWh
$10,690
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs