ITAC Assessment: SU0415
ITAC logo
ITAC Assessment: SU0415
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Treated Lumber
NAICS 321114: Wood Preservation
SIC 2491: Wood Preserving
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 260,000
ft2
Annual Production 28,700
thousand feet
Production Hrs. Annual 3,120
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $15,746 392,773
kWh
Electricity Demand $23,701 1,875
kW-mo/yr
Electricity Fees $2,156 -
Natural Gas $22,234 3,194
MMBtu
TOTAL YEARLY COSTS $63,837
RECOMMENDED SAVINGS* $11,945 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,610

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $335 - $685
17,124
kWh
- - $(-300.0) $(-50.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $121 $157 $60
1,489
kWh
$25
-
kW-mo/yr
- $23 $13
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,422 $27,505 $1,238
30,961
kWh
$5,475
-
kW-mo/yr
- $35 $(-326.0)
04 2.1224: Replace boiler $5,067 $23,111 - - $5,067
-
MMBtu
- -
TOTAL RECOMMENDED $11,945 $50,773 $1,983
49,574
kWh
$5,500
-
kW-mo/yr
$5,067
-
MMBtu
$(-242.0) $(-363.0)
TOTAL IMPLEMENTED $11,610 $50,773 $1,298
32,450
kWh
$5,500
-
kW-mo/yr
$5,067
-
MMBtu
$58 $(-313.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs