ITAC Assessment: SU0406
ITAC logo
ITAC Assessment: SU0406
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Wood office furniture
NAICS 337211: Wood Office Furniture Manufacturing
SIC 2521: Wood Office Furniture
Sales Range $5
M
to 10
M
# of Employees 68
Plant Area 85,000
ft2
Annual Production 4,000
pieces
Production Hrs. Annual 2,600
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,201 1,000,818
kWh
Electricity Demand $40,829 4,625
kW-mo/yr
Electricity Fees $691 -
Natural Gas $31,010 5,534
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,734 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,939

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,885 - $1,186
17,160
kWh
$699
-
kW-mo/yr
- - -
02 2.2437: Recover waste heat from equipment $1,714 - - - $1,714
-
MMBtu
- -
03 3.1161: Eliminate/reduce an operation $3,795 $1,535 $(-40.0)
(-586)
kWh
$(-318.0)
-
kW-mo/yr
- $315 $3,838
04 2.2136: Install / repair insulation on steam lines $644 $337 - - $644
-
MMBtu
- -
05 2.7135: Install occupancy sensors $126 $145 $126
1,820
kWh
- - - -
06 2.6211: Conserve energy by efficient use of vending machines $226 $287 $226
3,273
kWh
- - - -
07 2.1224: Replace boiler $8,344 $37,133 - - $8,344
-
MMBtu
- -
TOTAL RECOMMENDED $16,734 $39,437 $1,498
21,667
kWh
$381
-
kW-mo/yr
$10,702
-
MMBtu
$315 $3,838
TOTAL IMPLEMENTED $12,939 $37,902 $1,538
22,253
kWh
$699
-
kW-mo/yr
$10,702
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs