ITAC Assessment: MA0373
ITAC logo
ITAC Assessment: MA0373
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Acoustical Insulation
NAICS
n/a
SIC 3401:
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 82,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,000
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $18,796 268,464
kWh
Electricity Demand $25,793 1,734
kW-mo/yr
Natural Gas $21,159 2,409
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,645 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $843

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 3.5212: Regrind, reuse, or sell scrap plastic parts $12,250 $3,800 - - - $12,250
-
lb
02 2.2614: Use cooling tower or economizer to replace chiller cooling $4,884 $705 $4,884
70,340
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,081 $9,888 $1,169
16,706
kWh
$912
-
kW-mo/yr
- -
04 2.7491: Insulate glazing, walls, ceilings, and roofs $843 $448 - - $843
-
MMBtu
-
05 2.2443: Re-use or recycle hot or cold process exhaust air $587 $2,000 - - $587
-
MMBtu
-
TOTAL RECOMMENDED $20,645 $16,841 $6,053
87,046
kWh
$912
-
kW-mo/yr
$1,430
-
MMBtu
$12,250
-
lb
TOTAL IMPLEMENTED $843 $448 - - $843
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs