ITAC Assessment: SU0400
ITAC logo
ITAC Assessment: SU0400
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Industrial Filtration Products
NAICS 333999: All Other Miscellaneous General Purpose Machinery Manufacturing
SIC 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 74,000
ft2
Annual Production 470,000
pieces
Production Hrs. Annual 4,550
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,192 967,240
kWh
Electricity Demand $28,121 3,183
kW-mo/yr
Electricity Fees $423 -
Natural Gas $26,394 3,154
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,058 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,318

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $6,287 - - - - - $6,287
02 2.8114: Change rate schedules or other changes in utility service $4,921 - - - - - $4,921
03 2.4322: Use or replace with energy efficient substitutes $325 - $192
2,700
kWh
$133
-
kW-mo/yr
- - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $36 - $15
218
kWh
$21
-
kW-mo/yr
- - -
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,979 $2,144 $3,822
53,836
kWh
$3,689
-
kW-mo/yr
$(-1,532.0)
-
MMBtu
- -
06 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $1,555 $1,247 $1,555
21,903
kWh
- - - -
07 2.7314: Reduce ventilation air $2,479 $2,294 $520
7,335
kWh
- $1,959
-
MMBtu
- -
08 2.7491: Insulate glazing, walls, ceilings, and roofs $5,273 $6,721 - - $5,273
-
MMBtu
- -
09 2.7135: Install occupancy sensors $517 $709 $517
7,280
kWh
- - - -
10 2.7243: Improve air circulation with destratification fans / other methods $3,639 $5,931 $(-517.0)
(-7,276)
kWh
$(-88.0)
-
kW-mo/yr
$4,244
-
MMBtu
- -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $443 $865 $236
3,329
kWh
$40
-
kW-mo/yr
- $106 $61
12 3.1161: Eliminate/reduce an operation $1,381 $3,649 $(-107.0)
(-1,500)
kWh
$(-318.0)
-
kW-mo/yr
- $882 $924
13 2.6211: Conserve energy by efficient use of vending machines $176 $460 $176
2,481
kWh
- - - -
14 2.7142: Utilize higher efficiency lamps and/or ballasts $47 $163 $36
501
kWh
$11
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $33,058 $24,183 $6,445
90,807
kWh
$3,488
-
kW-mo/yr
$9,944
-
MMBtu
$988 $12,193
TOTAL IMPLEMENTED $11,318 $14,927 $1,517
21,375
kWh
$117
-
kW-mo/yr
$9,517
-
MMBtu
$106 $61
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs