ITAC Assessment: SU0399
ITAC logo
ITAC Assessment: SU0399
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Printed and Electronic Communication Programs
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 56,000
ft2
Annual Production 100,000,000
pieces
Production Hrs. Annual 4,680
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $192,886 2,078,820
kWh
Natural Gas $4,049 639
MMBtu
Other Energy $36,859 3,107
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,356 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Energy Savings One-time Revenue or Avoided Cost Savings
01 2.4322: Use or replace with energy efficient substitutes $837 - $837
9,000
kWh
- - -
02 2.7135: Install occupancy sensors $218 $67 $218
2,340
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $484 $529 $244
2,628
kWh
- - $240
04 2.4321: Upgrade obsolete equipment $1,131 $4,339 $1,131
12,168
kWh
- - -
05 2.2628: Utilize a less expensive cooling method $8,686 $33,817 - $(-23,173.0)
-
MMBtu
$36,859
-
MMBtu
$(-5,000.0)
TOTAL RECOMMENDED $11,356 $38,752 $2,430
26,136
kWh
$(-23,173.0)
-
MMBtu
$36,859
-
MMBtu
$(-4,760.0)
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs