ITAC Assessment: SU0387
ITAC logo
ITAC Assessment: SU0387
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Mass transit and commuter buses
NAICS 336120: Heavy Duty Truck Manufacturing
SIC 3711: Motor Vehicles and Passenger Car Bodies
Sales Range $100
M
to 500
M
# of Employees 290
Plant Area 147,500
ft2
Annual Production 479
units
Production Hrs. Annual 4,125
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,007 1,713,192
kWh
Electricity Demand $38,097 3,890
kW-mo/yr
Electricity Fees $61,217 -
Natural Gas $54,412 9,742
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,223 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Consumption Savings One-time Revenue or Avoided Cost Savings
01 2.4322: Use or replace with energy efficient substitutes $1,803 - $702
18,000
kWh
$1,101
-
kW-mo/yr
- - -
02 2.8121: Apply for tax-free status for energy purchases $1,211 - - - - - $1,211
03 2.2511: Insulate bare equipment $988 $858 $(-59.0)
(-1,516)
kWh
$(-21.0)
-
kW-mo/yr
$1,068
-
MMBtu
- -
04 3.4141: Replace the chlorination stage with an oxygen or ozone stage $15,923 $25,000 - - - $15,923
-
Tgal
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $776 $1,546 $263
6,745
kWh
$90
-
kW-mo/yr
- - $423
06 3.1182: Make a new by-product $20,522 $100,000 $(-105.0)
(-2,683)
kWh
$(-2,448.0)
-
kW-mo/yr
- - $23,075
TOTAL RECOMMENDED $41,223 $127,404 $801
20,546
kWh
$(-1,278.0)
-
kW-mo/yr
$1,068
-
MMBtu
$15,923
-
Tgal
$24,709
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Consumption Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs