ITAC Assessment: SU0385
ITAC logo
ITAC Assessment: SU0385
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Bread and Rolls
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 245
Plant Area 153,000
ft2
Annual Production 50,000,000
lb
Production Hrs. Annual 6,400
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $629,243 9,021,147
kWh
Electricity Demand $66,415 16,153
kW-mo/yr
Electricity Fees $23,072 -
Natural Gas $514,748 89,027
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $107,477 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $104,090

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $11,815 - $11,815
168,788
kWh
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,452 $1,124 $9,452
135,030
kWh
- - -
03 2.7224: Reduce space conditioning during non-working hours $3,387 $210 - - $3,387
-
MMBtu
-
04 2.2511: Insulate bare equipment $2,578 $370 - - $2,578
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $930 $1,060 $337
4,818
kWh
$27
-
kW-mo/yr
- $566
06 2.2414: Use waste heat from hot flue gases to preheat $78,891 $97,500 - - $78,891
-
MMBtu
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $424 $1,010 $251
3,584
kWh
$28
-
kW-mo/yr
- $145
TOTAL RECOMMENDED $107,477 $101,274 $21,855
312,220
kWh
$55
-
kW-mo/yr
$84,856
-
MMBtu
$711
TOTAL IMPLEMENTED $104,090 $101,064 $21,855
312,220
kWh
$55
-
kW-mo/yr
$81,469
-
MMBtu
$711
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs