ITAC Assessment: SU0375
ITAC logo
ITAC Assessment: SU0375
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Electrical Wiring Devices
NAICS 335931: Current-Carrying Wiring Device Manufacturing
SIC 3643: Current-Carrying Wiring Devices
Sales Range $10
M
to 50
M
# of Employees 96
Plant Area 48,000
ft2
Annual Production 120,000
pieces
Production Hrs. Annual 2,340
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $10,002 312,640
kWh
Electricity Demand $2,817 704
kW-mo/yr
Electricity Fees $3,000 -
Natural Gas $4,743 793
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,269 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,666

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4322: Use or replace with energy efficient substitutes $2,635 - $1,555
48,600
kWh
$1,080
-
kW-mo/yr
- - -
02 4.821: Pay bills on time to avoid late fees $291 - - - - - $291
03 2.7122: Disconnect ballasts $148 - $90
2,808
kWh
$58
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,510 $765 $106
3,328
kWh
$18
-
kW-mo/yr
- $990 $396
05 2.4322: Use or replace with energy efficient substitutes $580 $1,126 - - $580
-
MMBtu
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $221 $539 $135
4,212
kWh
$86
-
kW-mo/yr
- - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $496 $2,007 $496
15,505
kWh
- - - -
08 3.1161: Eliminate/reduce an operation $388 $1,660 $(-13.0)
(-420)
kWh
$(-144.0)
-
kW-mo/yr
- $210 $335
TOTAL RECOMMENDED $6,269 $6,097 $2,369
74,033
kWh
$1,098
-
kW-mo/yr
$580
-
MMBtu
$1,200 $1,022
TOTAL IMPLEMENTED $2,666 $3,311 $827
25,853
kWh
$162
-
kW-mo/yr
- $990 $687
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs