ITAC Assessment: SU0369
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Components and subassemblies for medical and defense applications
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 55
Plant Area 32,000
ft2
Annual Production 61,783
pieces
Production Hrs. Annual 6,500
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $43,735 1,077,653
kWh
Electricity Demand $42,686 2,732
kW-mo/yr
Electricity Fees $9,872 -
Natural Gas $5,957 669
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,640 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,541

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.4322: Use or replace with energy efficient substitutes $1,104 - $354
8,640
kWh
$750
-
kW-mo/yr
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,078 $20,000 $1,078
26,300
kWh
- - -
03 2.7224: Reduce space conditioning during non-working hours $463 - - - $463
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,903 $1,500 $2,903
70,800
kWh
- - -
05 2.7134: Use photocell controls $765 $1,578 $765
18,668
kWh
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $7,180 $15,512 $3,998
97,500
kWh
$2,813
-
kW-mo/yr
- $369
07 2.7135: Install occupancy sensors $1,532 $3,780 $1,532
37,375
kWh
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $615 $3,090 $269
6,570
kWh
$281
-
kW-mo/yr
- $65
TOTAL RECOMMENDED $15,640 $45,460 $10,899
265,853
kWh
$3,844
-
kW-mo/yr
$463
-
MMBtu
$434
TOTAL IMPLEMENTED $1,541 $20,000 $1,078
26,300
kWh
- $463
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs