Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Low Pressure Sewer Systems and Condition Monitoring for Power Generation
NAICS 333911: Pump and Pumping Equipment Manufacturing
SIC 3561: Pumps and Pumping Equipment
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 75,000
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 2,601
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $58,423 926,640
kWh
Electricity Demand $31,754 2,948
kW-mo/yr
Electricity Fees $7,476 -
Natural Gas $13,976 2,234
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,188 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,192

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $1,901 - - - - $1,901
02 4.821: Pay bills on time to avoid late fees $599 - - - - $599
03 2.7111: Reduce illumination to minimum necessary levels $223 - $223
3,537
kWh
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,291 $1,750 $2,291
36,370
kWh
- - -
05 2.6211: Conserve energy by efficient use of vending machines $373 $1,418 $373
5,921
kWh
- - -
06 2.7243: Improve air circulation with destratification fans / other methods $1,775 $5,400 $(-107.0)
(-1,720)
kWh
$(-12.0)
-
kW-mo/yr
$1,894
-
MMBtu
-
07 2.7314: Reduce ventilation air $1,026 $3,934 $132
2,100
kWh
- $894
-
MMBtu
-
TOTAL RECOMMENDED $8,188 $12,502 $2,912
46,208
kWh
$(-12.0)
-
kW-mo/yr
$2,788
-
MMBtu
$2,500
TOTAL IMPLEMENTED $4,192 $1,750 $2,291
36,370
kWh
- - $1,901
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs