ITAC Assessment: SU0335
ITAC logo
ITAC Assessment: SU0335
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Asphalt
NAICS 324121: Asphalt Paving Mixture and Block Manufacturing
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $1
M
to 5
M
# of Employees 6
Plant Area 12,800
ft2
Annual Production 63,286
ton
Production Hrs. Annual 2,120
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $45,168 157,248
kWh
Fuel Oil #2 $422,878 15,092
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $312,429 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $291,300

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings One-time Revenue or Avoided Cost Savings
01 2.2437: Recover waste heat from equipment $20,297 $5,686 $20,297
69,957
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $832 $386 $832
2,869
kWh
-
03 2.1331: Burn a less expensive grade of fuel $288,725 $218,600 - $288,725
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,709 $5,124 $1,709
5,894
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $866 $2,820 $866
2,985
kWh
-
TOTAL RECOMMENDED $312,429 $232,616 $23,704
81,705
kWh
$288,725
TOTAL IMPLEMENTED $291,300 $226,544 $2,575
8,879
kWh
$288,725
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs