ITAC Assessment: SU0321
ITAC logo
ITAC Assessment: SU0321
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Polyester Film
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $10
M
to 50
M
# of Employees 53
Plant Area 100,000
ft2
Annual Production 9,033
ton
Production Hrs. Annual 8,760
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $829,095 13,967,617
kWh
Electricity Demand $192,858 21,755
kW-mo/yr
Electricity Fees $14,877 -
Natural Gas $35,033 4,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,011 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,235

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7314: Reduce ventilation air $5,156 $9,920 $335
5,678
kWh
$222
-
kW-mo/yr
$4,599
-
MMBtu
- -
02 2.4321: Upgrade obsolete equipment $206 $669 $171
2,891
kWh
$35
-
kW-mo/yr
- - -
03 2.6211: Conserve energy by efficient use of vending machines $124 $395 $124
2,103
kWh
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $32,346 $123,757 $19,485
330,252
kWh
$4,009
-
kW-mo/yr
- $7,344 $1,508
05 2.7135: Install occupancy sensors $955 $4,144 $955
16,184
kWh
- - - -
06 2.3212: Optimize plant power factor $7,620 $38,838 - - - - $7,620
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,284 $1,655 $4,284
72,611
kWh
- - - -
08 3.1161: Eliminate/reduce an operation $2,320 $4,530 $(-64.0)
(-1,080)
kWh
$(-160.0)
-
kW-mo/yr
- $878 $1,666
TOTAL RECOMMENDED $53,011 $183,908 $25,290
428,639
kWh
$4,106
-
kW-mo/yr
$4,599
-
MMBtu
$8,222 $10,794
TOTAL IMPLEMENTED $40,235 $135,150 $24,955
422,961
kWh
$3,884
-
kW-mo/yr
- $8,222 $3,174
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs