Assessment Year | 2011 |
---|---|
Principal Product | Electrical Wire Devices |
NAICS | 335931: Current-Carrying Wiring Device Manufacturing |
SIC | 3643: Current-Carrying Wiring Devices |
Sales Range | $10 M to 50M |
# of Employees | 90 |
Plant Area |
52,317
ft2
|
Annual Production | 120,000
pieces
|
Production Hrs. Annual | 2,340
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $15,317 | 478,800 |
kWh
|
$0.032 |
Electricity Demand | $4,163 | 1,041 |
kW-mo/yr
|
$4.00 |
Electricity Fees | $3,024 | - |
|
- |
Natural Gas | $3,641 | 369 |
MMBtu
|
$9.87 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $4,764 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,886 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.6231: Utilize controls to operate equipment only when needed | $827 | - |
$827
25,841
kWh
|
- | - | |
02 | 4.821: Pay bills on time to avoid late fees | $87 | - | - | - | $87 | |
03 | 2.8118: Check for accuracy of utility / power meters | $972 | $300 | - | - | $972 | |
04 | 2.6232: Install set-back timers | $682 | $730 | - |
$682
-
MMBtu
|
- | |
05 | 2.6211: Conserve energy by efficient use of vending machines | $130 | $467 |
$130
4,069
kWh
|
- | - | |
06 | 2.4322: Use or replace with energy efficient substitutes | $1,570 | $6,012 |
$730
22,800
kWh
|
$840
-
MMBtu
|
- | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $496 | $2,355 |
$496
15,505
kWh
|
- | - | |
TOTAL RECOMMENDED | $4,764 | $9,864 |
$2,183
68,215
kWh
|
$1,522
-
MMBtu
|
$1,059 | ||
TOTAL IMPLEMENTED | $1,886 | $300 |
$827
25,841
kWh
|
- | $1,059 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs