ITAC Assessment: SU0298
ITAC logo
ITAC Assessment: SU0298
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Aluminum Foundry
NAICS 331524: Aluminum Foundries (except Die-Casting)
SIC 3365: Aluminum Foundries
Sales Range $10
M
to 50
M
# of Employees 51
Plant Area 250,000
ft2
Annual Production 106,000
units
Production Hrs. Annual 4,250
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $221,852 4,530,777
kWh
Electricity Demand $123,981 12,804
kW-mo/yr
Electricity Fees $21,427 -
Natural Gas $491,460 61,426
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $90,464 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 4.821: Pay bills on time to avoid late fees $21,457 - - - - - $21,457
02 2.4231: Reduce the pressure of compressed air to the minimum required $3,096 - $3,096
51,600
kWh
- - - -
03 2.2437: Recover waste heat from equipment $9,218 $1,248 - - - $9,218
-
MMBtu
-
04 2.7135: Install occupancy sensors $431 $86 $228
3,804
kWh
$203
-
kW-mo/yr
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $792 $266 $792
13,200
kWh
- - - -
06 2.6211: Conserve energy by efficient use of vending machines $125 $274 $125
2,079
kWh
- - - -
07 3.1191: Change procedures / equipment / operating conditions $35,873 $81,798 $(-1,919.0)
(-70,125)
kWh
$(-4,208.0)
-
kW-mo/yr
- - $42,000
08 2.7142: Utilize higher efficiency lamps and/or ballasts $15,123 $45,613 $10,385
173,063
kWh
$4,738
-
kW-mo/yr
- - -
09 2.3212: Optimize plant power factor $4,349 $17,933 - - $4,349 - -
TOTAL RECOMMENDED $90,464 $147,218 $12,707
173,621
kWh
$733
-
kW-mo/yr
$4,349 $9,218
-
MMBtu
$63,457
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs