Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Metal Finishing
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range less than $500
k
# of Employees 200
Plant Area 90,316
ft2
Annual Production 18,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $289,504 4,717,579
kWh
Electricity Demand $175,022 10,686
kW-mo/yr
Electricity Fees $95,725 -
Natural Gas $613,760 67,422
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,131 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,002

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,108 - $1,256
20,596
kWh
$852
-
kW-mo/yr
- - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,063 - $1,359
22,278
kWh
$704
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,749 $1,300 $5,112
83,803
kWh
$2,637
-
kW-mo/yr
- - -
04 2.7135: Install occupancy sensors $2,458 $429 $2,458
40,296
kWh
- - - -
05 2.2136: Install / repair insulation on steam lines $5,842 $3,612 - - $5,842
-
MMBtu
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $587 $435 $257
4,205
kWh
$98
-
kW-mo/yr
- $112 $120
07 2.7142: Utilize higher efficiency lamps and/or ballasts $16,145 $25,536 $11,804
193,508
kWh
$4,341
-
kW-mo/yr
- - -
08 2.6211: Conserve energy by efficient use of vending machines $179 $548 $179
2,935
kWh
- - - -
TOTAL RECOMMENDED $37,131 $31,860 $22,425
367,621
kWh
$8,632
-
kW-mo/yr
$5,842
-
MMBtu
$112 $120
TOTAL IMPLEMENTED $26,002 $26,836 $18,172
297,907
kWh
$7,830
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs